Skip to content
London Reconnections

London Reconnections

Covering transport topics in and around London & beyond

  • Home
  • Industry News
  • Monthly Meet Up
  • Why We Write

Category: London Bridge

Crossrail & Thameslink Budgets Under The Hammer?

On 28 May 2010 By Totteridge In Crossrail, London Bridge

Building Magazine reported this week that the government is considering cuts to Crossrail totalling £5 billion — almost a third of the project’s total £15.9 billion budget — in a worst-case scenario. Possible cuts include …

Continue reading

Posts pagination

«Previous Posts 1 2

Recent Comments

  • Anon Ped on Monday’s Friday Reads – 12 May 2025
  • W on Friday Reads – 9 May 2025
  • MiaM on French railway operator tests solar panel prototype between unused train tracks (E+T)
  • W on French railway operator tests solar panel prototype between unused train tracks (E+T)
  • Greg T on Friday Reads – 9 May 2025

Industry news

  • Monday’s Friday Reads – 12 May 2025
  • Tuesday LR Meeting 13th May 2025
  • Friday Reads – 9 May 2025
  • Monday’s Friday Reads – 5 May 2025
  • Friday Reads – 2 May 2025
All content copyright London Reconnections
OSZAR »